Monday 15th June 2026 saw the removal of 80105's boiler

Description
Early morning

80105 is outside at the crack of dawn waiting for the crane.

Description
Final check

A final check to ensure everything is clear before the lift commences.

Description
The lift continues

Very slowly the lift continues. The crane operator is very experienced and is taking his time to ensure a safe lift.

Description
Well clear

with the boiler well clear of the frmames it can be swung over for the removal of the ash pan.

Description
Ashpan

The ashpan is temporarily left to one side.

Description
150 tonne Crane

The crane is hired from Stoddart Crane Hire Muir of Ord and can lift up to 150 metrivc tonnes.

Description
Lift starts

The heavy lift begins.

Description
Clear of frames

The boiler passes the tank top level on its way safely upwards.

Description
Swung clear

Well clear of the tanks the boiler is move over.

Description
Ashpan clear

The ashpan is removed from the boiler prior to being placed on the lowloader wagon.

Photo's courtesy of Taylor Shaw and LOG(S) Director Brian Thomson